Apex Lufkin 182-HC253N 0.37 in. x 50 ft. Tape Long Leader
MSRP:
$94.78
$68.48
Sorry - this product is no longer available
Features- Across the board, our tools stand for quality, innovation and value
- Our portfolio of over 30 innovative brands includes many category
Specifications- Color: Black
- Case Material: Vinyl-Covered Steel
- Blade Material: Steel
- Blade Length: 50 ft.
- End Type: Folding End-Hook Ring
- Reel Type: Closed Reel
- Weight: 13 lbs